What Does a Pre-Demolition Look Like?

When demolitions go wrong

Before you can obtain a permit and start breaking down walls, there are some things that you must consider first. Both the property’s owner and the demolition company need to know what is needed for the responsible, legal, and safe demolition. Let us check on some criteria that you need to investigate before obtaining a permit. You should note that every location will need different requirements.

Informing the Neighboring Property Owners

Meeting and notifying the neighbors properly regarding the plan of demolition is important before one obtains a demolition permit. This meeting will need to be documented as proof that it happened will be necessary in some locations. You will need to take note about the demolition plans, the impact of this to the business owners and the neighboring residents, and the information that will be discussed in the meeting.

Inspections of Asbestos by the Professionals

Before you can get a permit, lots of areas will want a professional to inspect the residential properties for the presence of asbestos. These inspectors who mostly work under the government should have access to the areas that will be demolished to check if the property’s construction have used asbestos or not.

These kinds of inspections will include checking the ceilings, water storage tanks, furnaces, siding, roofing, wall panels, and other areas. Now, if the inspector finds asbestos-looking materials, these will be tested further in the laboratory for confirmation. If the testing verifies that asbestos is present, this material will need to be disposed according to the federal and local laws that concerns disposing and handling of asbestos.

City Utility Disconnection Permit

The demolition coordinator will need to get a permit regarding the disconnection of city utilities. This includes the sewer, gas providers, water, and electricity. Most often, obtaining this permit will charge a fee of around $75. This fee will mostly cover the administrative and professional inspection cost of the line that you will have to disconnect. You must ensure that you hire professionals in disconnecting these lines before starting with the demolition to ensure public safety.

Signages for Demolition

If you already have a demolition permit, the code and building departments of your municipality will give you demolition signs for you to display in public. The department will be the one to determine on the length of time that these signages must be displayed. Note that displaying these signages are crucial for the public’s safety.

Well or Septic Tank Demolition

If you have a septic sewage or a well in your property, it is important that you dispose this appropriately. You must ensure that you follow the ordinances in your local area in doing this before you start to demolish your property.

Now, before you will be allowed to start with your demolition, a certified septic or well professional should confirm that the well has been buried or demolished properly.

Property Securing

Most local authorities will need you to secure your property for a time before you can begin with the demolition. Securing a property will help in protecting the property owners from possible thieves and trespassers. Also, this will help in preventing the public from acquiring injuries from the hazards of your property.

 

Is there an easier way to do this?

If you feel like there are lots of things that you should do before obtaining a demolition permit, you’re right. That is why it is important that you work with an insured, licensed, and expert demolition company. Know that doing so will make sure that this process will be made easy for you. One great demolition company in town is Conway AR Demolition Contractor. Call us now so that we can help you right away!

Are you not sure on whether you can still repair your home or just demolish it? Read all about the 4 Signs Your Home Needs to be Demolished in the net blog.